Final Audit

The Final Audit module is your watchdog to ensure that every unit that is released for shipment has met all production criteria and passed all checks and tests. The system verifies that the proper components were installed at the proper station by a qualified operator using calibrated equipment and that the unit passed all functional and quality tests.

Key Benefits:

Ensure 100% compliance with production and quality standards

Print shipping label only after Final Audit is passed

Know you are shipping a quality product every time

Links to Production Controller Modules:

Test Controller
Tool Control
Work Instructions
Andon
Final Audit
Pick-to-Light
Product Verification
Order Marriage
On-Demand Printing
Defect Registration
Operator Certification
Critical Component Validation
Customer-Defined Process